Your final cost will depend on the slabs size thickness and if you any special reinforcement such as wire mesh or rebar.
20x20 concrete slab how many yards.
It makes your construction project planning and budgeting more accurate.
Click the button to calculate the volume of concrete and man hours not including mixing needed for this job.
However costs can rise if you d like to have something decorative as a stamped concrete patio or if you re looking to have curves and other decorative edging features installed.
900 x 5 50 dollars 4950 00.
A typical concrete slab costs 4 to 8 per square foot with most homeowners spending between 5 35 to 6 17 per square foot or 113 to 126 per cubic yard for both materials and installation.
How much does a concrete slab cost.
Our concrete calculator provides you an easy way to calculate concrete volume and estimated cost of concrete slabs footers walls columns steps stairs curbs and gutters in cubic feet cubic yards and cubic meters and inches.
This will ensure you can complete your project in a single pour without needing to get more concrete to complete the project if you re short.
Add 5 10 additional material to account for settling spillage and waste.
Calculate volume of square slab calculator use.
What is the basic cost for a 30 x 30 concrete slab.
Or 4950 00 so 30 x 30 900 sq.
Many ready mix companies will have a minimum order of 1 yard and will charge shortage fees when ordering partial batches.
Calculate volumes for concrete slabs walls footers columns steps curbs and gutters.
Assuming you need a slab 25 feet x 32 feet x 4 you would need 10 yards of concrete.
The estimated cost for a 30 x 30 x 6 thick concrete slab like the one you see pictured above is 5 50 per sq.
If you re planning to order concrete from a ready mix supplier they ll need to know how many yards of concrete to deliver.
Inch slab well i m going to leave this part of the job pros garage is be 20 x which would 6.
Input length width and depth of the area.
25 x 32 x 33 27 9 7 cubic yards.
Or 6 10 00 per square foot.
This calculator is to be used as an estimating tool only.
The average truck holds between 9 and 11 yards total.
On average it will take 90 40lb bags 60 60lb bags or 45 80lb bags to fill one cubic yard of concrete.